CEMENT PLANT

  The offer is for a cement plant of 2nd hand with 2 lines of 750 MT/day, for which the engines and transmissions are of the year 1981 but t...



 

The offer is for a cement plant of 2nd hand with 2 lines of 750 MT/day, for which the engines and transmissions are of the year 1981 but the other parts such as control and  furnace lining  are totally new. The work is developed in such a way that a crusher and 1 packaging facility are required. This price contains: Disassembly,  Sand blaster, a varnish, the loading, transportation, reconstruction, start-up as well as movement of the Engineering price.

Price: €25M (Twenty-five million euros) + 3% of commissions.

 The above price includes a production aid, training and the worker training. The work will be followed for 6 months from to start-up by our work managers.

Warranty: 12 months 

If interested  we need an LOI + BCL.

In the price is not included:  buildings, Fundaments (Base),  Connections,  Power Connection) and  Water Connection.

The construction of the structure for the first line will take 1 year from the sign of the contract.

The plans for the foundations and buildings can be delivered to the client.


Related

Industrial 9028399409451416299

Posta un commento

emo-but-icon

Follow Us

GOLD PRICE

Shopping Cart


Currently cart is empty.

Sub Totals:
Tax:
Shipping:
Grand Total:


Empty Cart

Hot in week

Recent

Comments

SPECIAL

QR CODE

QR CODE
ICC Global Solutions

Subscribe Newsletter

Join Our Free Newsletter

INTERNATIONAL SHIPPING

FACEBOOK

item